Okay, okay! I’ve been slack updating my blog, so I should give an update of all the different tasks I’m doing and where I’m up to with them.
Tea Hedge
- After planting the tea hedge it was realised that the area gets too wet and the plants would drown.
- I’ve started building a small retaining wall around the hedge location so I can fill it with dirt and raise the tea plants above the pools of water that form.
- I have installed 3 of the 3m sections and 1 of the 1 metre sections of the retaining wall. I still have to install 2 more 3 metre sections and a 1 metre section.
- After completing the retaining wall I will need to dig up all the tea plants and add approximately 4 or 5 cubic metres of soil.
- To complete the retaining wall I had to purchase 22 x 3 metres sleepers, 52 x 150mm screws, 60 x 75mm screws, a chainsaw (to cut the sleepers) and a post-hole digger (’m not going to manually dig 600mm into pug soil).
- I still need to adjust the over-flow pipe on my tank so It does not fill the tea hedge area.
- The wall should be completed this Saturday (although I will not have the dirt by then).
Concrete Removal
- The concrete removal hasn’t progressed much lately.
- About 1/3rd of the concrete has been removed.
- A further 1/3rd has been broken, ready to be removed.
- I hope to have this done either Sunday this week or Saturday next week.
Ensuite
- The ensuite is slowly progressing.
- The electrician, unfortunately, found full-time work in the area and has not been able to do the wiring as yet.
- After the electrician has done the wiring I will install the other half of the roof and the cement sheet walls.
- I currently have the majority of parts to do the plumbing in the ensuite, this will be started as soon as possible.
- I will begin with the waste-water pipes, then proceed to the cold water pipes.
- Hot water installation will be combined with solar hot water installation.
- Window frosting will be installed after I have painted the ensuite, which will happen after the cement sheet is installed.
- Floor tiling will happen after the painting, and then I will just have to put everything in place.
Robe
- I’ve worked out what color to do the robe.
- I need to buy the wood to build the robe next.
- I will do this after I have completed the ensuite.
Waste-water System
- The waste-water system plans are currently with the council and should be approved this week.
- The waste-water system will be installed once I have completed the backyard and ensuite.