Okay, okay! I’ve been slack updating my blog, so I should give an update of all the different tasks I’m doing and where I’m up to with them.
Tea Hedge
- After planting the tea hedge it was realised that the area gets too wet and the plants would drown.
- I’ve started building a small retaining wall around the hedge location so I can fill it with dirt and raise the tea plants above the pools of water that form.
- I have installed 3 of the 3m sections and 1 of the 1 metre sections of the retaining wall. I still have to install 2 more 3 metre sections and a 1 metre section.
- After completing the retaining wall I will need to dig up all the tea plants and add approximately 4 or 5 cubic metres of soil.
- To complete the retaining wall I had to purchase 22 x 3 metres sleepers, 52 x 150mm screws, 60 x 75mm screws, a chainsaw (to cut the sleepers) and a post-hole digger (’m not going to manually dig 600mm into pug soil).
- I still need to adjust the over-flow pipe on my tank so It does not fill the tea hedge area.
- The wall should be completed this Saturday (although I will not have the dirt by then).
Concrete Removal
- The concrete removal hasn’t progressed much lately.
- About 1/3rd of the concrete has been removed.
- A further 1/3rd has been broken, ready to be removed.
- I hope to have this done either Sunday this week or Saturday next week.
Ensuite
- The ensuite is slowly progressing.
- The electrician, unfortunately, found full-time work in the area and has not been able to do the wiring as yet.
- After the electrician has done the wiring I will install the other half of the roof and the cement sheet walls.
- I currently have the majority of parts to do the plumbing in the ensuite, this will be started as soon as possible.
- I will begin with the waste-water pipes, then proceed to the cold water pipes.
- Hot water installation will be combined with solar hot water installation.
- Window frosting will be installed after I have painted the ensuite, which will happen after the cement sheet is installed.
- Floor tiling will happen after the painting, and then I will just have to put everything in place.
Robe
- I’ve worked out what color to do the robe.
- I need to buy the wood to build the robe next.
- I will do this after I have completed the ensuite.
Waste-water System
- The waste-water system plans are currently with the council and should be approved this week.
- The waste-water system will be installed once I have completed the backyard and ensuite.
COMMENTS
There are no comments so far...
Comment Form
Improve the web with Nofollow Reciprocity.







Renovations, house
back yard, concrete removal, ensuite, retaining wall, robe, tea hedge, waste-water management system
0